docs: add v0.6.0 release test plan and results#821
Closed
kvinwang wants to merge 6 commits into
Closed
Conversation
kvinwang
marked this pull request as draft
July 23, 2026 07:44
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Key real-hardware result
With a locally provisioned PCCS, the production SGX Local-Key-Provider and full TDX rolling-upgrade suite complete successfully. The clean run covered a v0.5.11 guest, a current guest, KMS onboarding, and two Gateway rolling upgrades with 4,350 HA probes, 0 failures, and preserved KMS/Gateway identity and state.
The report intentionally leaves COMP-02/08/09 and the physical-host portion of COMP-10 incomplete rather than extrapolating from adjacent coverage.
Harness fixes: #819 and #820.
Verification
prek run --all-files